Connect to public heat network or to be capture ready

Goal is to ensure the residual heat of the data centre shall be used to supply the local (envisaged) public heat network and its subsequent users. Ensure that the data centre is ready to connect to the public heat network or be ready by having a physical connection ready and a technical room reserved to upgrade the heat to the required temperature for the heat network. The required electrical capacity for the installation of the heat pump needs to be contracted with the grid operator and the heat pump needs to be powered by renewable energy sources.